Place of Origin:
Shanghai, China
Brand Name:
YASEN
Introducing our latest addition to the commercial laundry equipment line, the 10kg rated capacity dry cleaning machine with a compact 340mm depth. This machine is designed to meet the rigorous demands of professional laundry operations, providing efficient and reliable dry cleaning solutions for businesses of all sizes.
| Category | LS-608C | LS-610C | LS-612C |
|---|---|---|---|
| Washing Capacity (kg) | 8 | 10 | 12 |
| Capacity of Drum (L) | 140 | 170 | 198 |
| Washing Speed (r/min) | 38 | 38 | 38 |
| Extracting Speed (r/min) | 400 | 400 | 400 |
| Hydraulic Pump Power (kw) | 0.55 | 0.55 | 0.55 |
| Drive Motor Power (kw) | 1.5 | 2.2 | 2.2 |
| Filter Motor (kw) | 0.55 | 0.55 | 0.55 |
| Power Supply | 3P/220V/380V | 3P/220V/380V | 3P/220V/380V |
| Frequency (Hz) | 50 | 50 | 50 |
| Dimension L*W*H (mm) | 1680*1250*1970 | 1680*1250*1970 | 1820*1330*2200 |
| Net Weight (kg) | 980 | 1150 | 1280 |
The whole machine comes with a 1-year guarantee, lifelong technical support, and guaranteed spare parts supply. Our engineers are available for overseas service.
Main spare parts (excluding consumable accessories) are covered under ONE YEAR warranty with defects from manufacturer, including free shipping.
| Products | Middle East | Africa | European & American | Asia |
|---|---|---|---|---|
| Sea Transport (Door to Door) | 15-22 Days | 25-40 Days | 15-35 Days | 6-14 Days |
| Express - DHL | 4 Days | 5-6 Days | 3-4 Days | 2 Days |
| Express - FedEx | 5 Days | 6 Days | 4-5 Days | 3-4 Days |
| Express - UPS | 6 Days | 6 Days | 6-7 Days | 5-6 Days |
| Express - TNT | 6-7 Days | 6-7 Days | 5-6 Days | 4-6 Days |
| Air Transport | 4-5 Days | 5-8 Days | 4-6 Days | 1-3 Days |
Yes, we are the manufacturer with over 28 years of experience in washing machine production. You are welcome to visit our factory and inspect our machines on site.
Yes, the manufacturer provides one-year warranty for main parts of the machine (excluding vulnerable parts). In case of quality problems during normal use, spare parts will be provided free of charge.
Our industrial laundry equipment is CE certified, and our factory operates under ISO9001 and ISO14001 management systems.
Voltage is customized according to your local requirements, with different voltages and frequencies to meet various countries' power standards.
For regular models, delivery takes 10-20 days. Customized items are produced according to order conditions.
Our online technicians are available 24/7 to assist with any questions about washer extractor usage.
Send your inquiry directly to us